Daski Furniture hospitality workshop
Enterprise Profile

About Foshan Daski Furniture Co., Ltd.

Direct FF&E Manufacturer

Precision Hospitality Engineering Since 2004

Foshan Daski Furniture Co., Ltd. is a dedicated custom contract furniture manufacturer located in Jiujiang, Foshan — the world-renowned epicenter of hospitality furniture production in southern China. Founded in 2004, our facility covers 28,000 m² of modern industrial workshops backed by a 2,000 m² project showroom displaying complete 1:1 guestroom mock-ups and F&B installations.

For more than two decades, we have partnered directly with international hotel owners, luxury resort developers, contract procurement firms, and interior architecture practices across North America, Europe, the Middle East, and the Asia-Pacific region. Our team executes bespoke FF&E packages adhering faithfully to global brand design standards.

With an experienced technical force of over 200 skilled craftsmen and structural CAD engineers, we ensure that every custom piece achieves structural integrity, acoustic performance, ergonomic comfort, and regulatory compliance for commercial high-traffic hospitality environments.

"A direct factory infrastructure bridging designer vision, commercial durability, and zero-defect execution."
1 to 1 hotel sample room constructed by Foshan Daski Furniture Co., Ltd.
2004
Established In Foshan
28,000m²
Production Facilities
200+
Craftsmen & Engineers
1,000+
Global Projects Furnished
Manufacturing Scope

Tailored FF&E Capabilities Across Key Hospitality Segments

From precision-veneered guestroom casegoods to contract-grade restaurant booth seating and dramatic lobby centrepieces, our vertically integrated lines control quality at every stage.

Guestroom Casegoods & Suites

Engineered hotel bedroom packages including integrated LED headboard panels, nightstands, credenzas, wardrobes, luggage benches, and vanity consoles manufactured with moisture-resistant E0/E1 substrates and precision edge-banding.

Restaurant, Café & Banqueting

High-durability dining chairs, bespoke restaurant banquette and booth seating, natural marble and solid wood dining tables, and bar counters engineered for high-turnover hospitality operations.

Lobby & Public Space Seating

Statement modular sofas, reception desks, feature lounge chairs, and architectural millwork crafted with kiln-dried hardwood interior structures and commercial-grade high-resilience flame-retardant foams.

Production Integrity

Our Controlled 5-Stage Engineering Workflow

Eliminate procurement uncertainties. We employ a verifiable stage-gate quality assurance process from drawing release through international container dispatch.

CAD shop drawing review at Foshan Daski Furniture Co., Ltd.
PHASE 01

CAD Shop Drawings

Our engineering bureau translates designer concepts into millimetre-accurate 1:1 shop drawings, detailing joinery, hardware fittings, and finishes within 5 to 10 working days.

1 to 1 hotel mock-up sample room production
PHASE 02

1:1 Mock-Up Room

A full-scale sample room is constructed within approximately 20 days, allowing brand owners, designers, and project managers to audit dimensions, finish sheen, and comfort.

Material and veneer inspection at Daski factory
PHASE 03

Raw Material Vetting

Selection of certified solid timber, natural quarter-cut/crown-cut veneers, stainless steel accents, and upholstery lab-tested to CAL TB 117 and BS 5852 flammability standards.

Pre-assembly testing in Foshan Daski Furniture workshop
PHASE 04

Pre-Assembly Trial

Every room model undergo mandatory dry pre-assembly on our test staging floor to verify seamless fitment, cable management channels, and structural strength before finishing.

Precision mass production and export packing
PHASE 05

Batch Run & Crating

Mass manufacturing completed within 45 days, followed by multi-layer foam wrapping, corner armoring, and room-coded crating for frictionless ocean transit and on-site distribution.

Quality & Compliance

International Certifications & Engineering Standards

Sourcing contract furniture from Foshan Daski Furniture Co., Ltd. eliminates code-compliance bottlenecks with hotel brand auditors and municipal fire authorities.

Compliance Metric Factory Standard Applied
Quality Management ISO 9001:2015 audited workflow with end-to-end traceability
US Flammability CAL TB 117-2013 compliant foams, barrier interliners & fabrics
UK Flammability BS 5852 Source 0, 1 & Crib 5 certified contract specifications
Panel Formaldehyde E0, E1 & CARB P2 certified plywood and MDF core boards
Hardware Specifications DTC / Blum concealed soft-close runners rated for 80,000+ cycles
Lacquering & Finishes Environmentally safe PU and waterborne coatings, scrub-tested
Export Packing EPE pearl foam, corner paper-board protectors, wooden frame crates

Direct Manufacturer Accountability

We do not outsource critical operations. Carpentry, veneer lamination, metal accent manufacturing, spray finishing, and upholstery are housed within our 28,000 m² compound.

Predictable Project Scheduling

Our dedicated scheduling system commits to strict milestone handovers: CAD shop drawings in 5–10 days, 1:1 mock-up sample rooms in 20 days, and batch fabrication within 45 days.

Jobsite Logistics & Installation

All items are labeled with exact floor, wing, and unit numbers. When requested, our seasoned engineering supervisors deploy directly to overseas project jobsites to oversee installation.

Partner With Us

Ready to Engineer Your Next Hospitality Project?

Submit your architectural schedules, BOQ, or designer renderings. Our senior technical estimators and FF&E project engineers will provide an engineering review and commercial quotation. Reach us directly at [email protected].